Week 4 Synopsis at Lahav

In the last week and a half, we finished up work in both areas as well as opening up another area to the bottom of the site. As always, as we got deeper and deeper, the finds just kept getting better. In a back room of the house, I found another destruction area with a large oil lamp, some weaving materials, and one almost intact juglet. Below are the final photos of the site, used in the final report. We spent an entire morning sweeping and cleaning up before being able to take the pictures with a drone. Even after taking the final photos, we kept working in one area with a large saturation of loom weights. Eventually, it was apparent that the loom weights were in a line and that a loom could possibly have been standing there at the time of destruction.

[Read more…]

Week 3 Synopsis at Lahav

Screen Shot 2016-08-24 at 7.39.28 PM

[Read more…]

Week 2 Synopsis at Lahav

This week, we found a plaster floor surface. From the top, it looked like just another layer of rocks to dig through, but from the side, one supervisor noticed a thin white line running across the layers. It was honestly one of the coolest things ever. Once we dug down to the line, there was the nice white plaster surface. Only a few minutes later and our eyes were opened to the other thin white lines running through all the cross sections—barely discernible.

[Read more…]

First Week Synopsis at Lahav

screen-shot-2016-06-03-at-5-18-29-pm

[Read more…]